Great Porcelain Scrub, Part II

I’ve learned from the DIY host Nicole Curtis that sometimes old plumbing fixtures just need some tough love in the form of elbow grease and lots of scrubbing. I realized what she meant when it was time to either clean or scrap the old cast iron tub. So now it was onto the original kitchen sink that was still in the house.

What that really means, is I’m starting to actually transition from demo/messmaking mode into cleaning and putting away mode! I’ve set the move-in date for the end of November, which means I have an entire workshop of tools and such to move OUT of the house and then a total scrub down of every surface in every room! No, it won’t be the Taj Mahal, but at least it will be clean and I can then work on 1 room at a time – no more tearing out floors or demoing plaster walls.

So I started with the kitchen area. Tonight after work I went to town on the kitchen sink and window.

IMG_2448

The kitchen sink is the same to me as the bathtub – sure they are filthy and a few dings here and there, but they are original. They give the house that bit of character and charm that says old but loved. Sure there are a few blemishes, but so do all vintage pieces – and those imperfections make it perfect for this house and for the kitchen I have in my mind.

But an hour and some elbow grease and voila!

IMG_2455

It’s shiny and white again, thanks to a little Bar Keepers Friend and a well worn Scotch-Brite pad. Not a bad before & after! (Ignore the extra hole to the left of the faucet – I’ve got it plugged from underneath for now, but when I finally – or if I ever- get to the full kitchen renovation, that will be a great spot for either a faucet sprayer OR this handy air switch for a in-sink disposal!)

photo

Advertisements

, , , , ,

Leave a comment

More Done, More to Do

Although work and life has been busy over the last few weeks, (including a friend’s wonderful wedding weekend and a crazy Halloween party), I’m still getting work done on the humble bungalow. Slowly but surely.

Although I had finished the roof on the house the weekend before (rain and all), I still had the garage to tear-off and re-roof. Just a 1 car garage so I kept saying how I’d like to get it all done in one weekend. And we basically did.

IMG_2336

Turns out there were 3 full layers of asphalt on the garage – but no shake shingles underneath. So although the extra layer of shingles took more time to tear-off, I saved time not needing to lay down new decking across the roof. It was tear-off and then immediately rolling out the felt paper. Although one afternoon did get rainy, we were able to spend all day Sunday getting it finished – literally working until dark and bringing out the work light for the last few rows.

IMG_2331

But we got it all finished – I know its just a roof, but damn I’m proud of it! The difference of before and after makes the entire house look different!

Going back inside, I had left the bathroom without the finishing touches in order to get the roof replaced this fall. Although I had a working toilet, the kitchen sink was the only running faucet inside the house. I had begun the process of refinishing an old dresser to transform it into the bathroom vanity, but it sat unfinished for a few months.

P1030885 B

I bought it from a Craigslist seller earlier this summer and envisioned it as a sink base. 1 drawer was already entirely busted, and even with my experience repairing broken furniture it was too far gone. So I didn’t feel bad cutting into the dresser top and altering the remaining drawers to make room for the sink drain and supply lines. I also stained the cabinet a bit darker for a richer contrast between the wooden vanity and all white bathroom tile. 4 layers of marine varnish later, and the cabinet was ready for the sink bowl.

IMG_2443

I attached the faucet to the sink before placing the bowl into the cabinet – much easier to do that step when the sink is on the floor and you don’t have to lay on your back on the floor. When it came time to glue the sink bowl in place, I knew I didn’t want to move the sink around and smear silicone all over the dresser top. So I first dry-fit the sink, measuring from left to right, making sure the sink was centered. Once in place, I used masking tape to outline the perimeter of the sink. This way I knew exactly how to center the sink and this also gave me an extremely clean line for the silicone that squeezed out. The result speaks for itself – and is exactly the look I had in my mind.

IMG_2450

Such clean silicone lines! And that wood counter is shine-y! Looks like glass, but it should hold up to water from the bathroom sink just fine for years to come.

IMG_2452

I have the top drawers installed in this photo.  They each had to be altered to make way for the curve of the sink bowl and additional space for the drain and supply pipes. In reality, the top drawers are only about half as wide as they were originally, but this way they still function and provide some storage. Enough room for all the typical top drawer bathroom items; toothpaste, toothbrush, razors, bar soap, and everything else that always finds its way here.

The middle drawer isn’t in the photo yet, I have one more coat of poly to brush onto that drawer front. For the bottom drawer opening, I’m thinking about a few slats across the bottom to hold a few baskets – stuff them with rolled up towels or something.

, , , , , , , , ,